降排水、土方分层次开挖、土钉墙施工、水平支撑及斜撑施工、支撑及围护桩拆除、基坑监测等多项施工技术,确保
了该基坑施工的顺利进行,可为类似工程提供经验参考。关键词:深基坑;围护结构;土方开挖;土钉墙;水平支撑;斜撑中图分类号:TU753.1 文献标志码:A 文章编号:1004-1001(2019)06-1004-03 DOI: 10.14144/j.cnki.jzsg.2019.06.005Construction Technology of Deep Foundation Pit with Multiple Support FormsCAO Yuejun CHENWanli ZHAO MingZhongtian Construction Group Co., Ltd., Hangzhou, Zhejiang 310008, ChinaAbstract: Combined with engineering examples, according to their characteristics of the large excavation face of
foun dation pit and its complex combi nation of retai ning structures, the construction scheme of deep foundation pit
wasdeveloped. Several construction techniques, such as foundation pit drainage, multi-level excavation, soil nail wall construction, horizontal support and indined support construction, removal of support! ng and retai ning piles, foundation
pit monitoring, etc. were elaborated in detail, to ensure the smooth construction of the foundation pit and to provide a reference for similar projects.Keywords: deep foundation pit; retaining structure; earth excavation; soil nail wall; horizontal support; inclined support如今对于房建工程,在确保基坑安全的同时,甲方不 断追求经济性以及考虑有利于缩短工期的基坑支护方案,
当基坑工程较深且较大时,基坑围护设计方案往往采用多
土支撑、三轴水泥搅拌桩等。2
种支护形式的组合W多种基坑支护的组合会对基坑工程施工的部署、土方
工程地质及水文地质条件基坑最大开挖深度为12.49 m,根据地质勘察报告可
知,基坑开挖深度影响范围内的土层包括①人工填土、②
淤泥质黏土、③含砾粉质黏土、④粉质黏土夹碎石。开挖、围护结构流水施工、工期安排提出更高的要求。结 合实际工程,对多种形式组合的基坑围护结构施工进行研
究,为类似工程提供参考。根据勘察报告,天目山路北侧有沿山河分布,系钱塘 江水系的三级支流。场地东西两侧各有一股山水通过建设
场地。场地勘探深度以浅地下水,按埋藏和赋存条件可分
1 工程概况杭政储出(2011) 12号地块商业金融用房项目工程位
为第四系松散岩类孔隙潜水和基岩裂隙水。于杭州市西湖区古荡,其北为天目山路,东为F-10地块, 3 基坑支护概况1) 西北侧。釆用e 600 mm钻孔灌注桩加1道钢筋混凝
西为杭州照相机械研究所,南为西溪路和浙江大学科技
园,地块大致呈长方形。3.1基坑西侧土支撑结合顶部放坡的支护形式;西侧中部采用¢800 mm 钻孔灌注桩复合土钉墙围护形式。本工程地下2层,地下室基坑实际开挖深度为5.8〜
12.9 m。基坑支护采用多种形式,包括钻孔灌注桩、放
坡、I道水平钢筋混凝土支撑、复合土钉墙、斜向钢筋混凝2) 西南角。采用¢800 mm钻孔灌注桩加1道水平钢筋
混凝土支撑结合支撑梁标高以上复合土钉墙、顶部放坡的
支护形式;在角部距离用地红线较近位置,支撑梁顶部增
作者简介:曹跃军(1986—),男,本科,工程呷。通信地址:断江省杭州市上城区之江路438号中天商务揍
设局部支撑。4揍(310008) o电子邛需:413969372@qq.com收稿日期:2019-02-273.2基坑南侧1)基坑西南侧。釆用¢900 mm钻孔灌注桩加1道水平
钢筋混凝土支撑,支撑标高以上部位采用复合土钉墙的支
r\\100412019 • 6 • Building Construction曹跃军、陈万里、赵 明:多种支护形式的深基坑工程施工技术护形式。2)其余部位。采用0 900 mm或0 1000 mm钻孔灌注
桩加斜向钢筋混凝土支撑,标高以上部位采用复合土钉墙
的支护形式;斜向支撑设置前,须在基坑周边留土。3.3基坑北侧1) 基坑西北侧。采用¢600 mm钻孔灌注桩加1道水平
钢筋混凝土支撑,结合4> 650 mm三轴水泥搅拌桩作止水帷
幕的围护形式。2) 其余部位。采用0 600 mm钻孔灌注桩复合土钉墙
支护方式。3) 基坑东北部。局部含淤泥层处增设三轴水泥搅拌桩
止水帷幕和三轴水泥搅拌桩被动区加固。3.4基坑东侧基坑东侧采用大放坡的支护形式。4
施工难点1) 基坑开挖深度5.8〜12.9 m,为确保基坑安全和减少 基坑变形,釆用分层分段、对称平衡的方式进行开挖。2) 基坑开挖深度范围内的③、④层为可塑至硬塑的粉
质黏土,渗透性与淤泥质土层相当,釆用自流深井、轻型
井点等降水措施的效果差,无法保证降水和排水质量。因
此釆用在钻孔灌注围护桩表面设置喷射混凝土面层,面层
内设置泄水孔排水的做法,施工时必须控制混凝土面层的
施工质量,确保其止水效果。3) 本基坑地下水位较高,受南侧山体山水影响明显,
基坑外侧需设置大断面排水沟,保证其排水满足要求。4) 基坑南侧留土区域土方,需要等到底板、底板加强
传力带达到设计强度后,方可挖除,需将小挖机及小型运
输车吊入坑内,土方短驳至施工大门位置,再采用长臂挖
机在基坑顶部掏挖。5) 基坑四周道路上埋设有通信管线、自来水管道、雨
水管道、污水管道等重要管线,基坑周边有浅基础建筑,
因此土方开挖前需进行建筑物安全鉴定,且施工过程中应 加强监测,密切关注监测数据变化,确保周边环境安全。6) 开挖深度范围局部存在淤泥、淤泥质粉质黏土等,
该部分土质较差,挖土时需釆取相应措施。5 关键施工技术5.1 土方开挖土方开挖时,针对基坑较深、周边情况复杂等特点,
合理选择施工机械,用多机组、多层段、多班次立体交叉 流水作业,做到充分利用空间和时间,做好各工种、各 工序的配合,保持多机组连续作业。土方开挖阶段配备
PC300挖机1台、PC200挖机5台、PC80挖机1台,201自卸车 30辆,土方约290 000 m'。按后浇带分为2个施工区块、8个
施工段。1) 西区块第1施工段:土方开挖分3次自上而下进行。
第1次开挖至钢筋混凝土支撑梁垫层底(一6.70 m),开挖
深度1.70 m;第2次开挖至一&60 m,开挖深度1.70 m;第3 次挖至基底上0.30 m。2) 西区块第2施工段:土方开挖分4次自上而下进行。
第1次开挖至钢筋混凝土支撑梁垫层底(一4.35m),开挖
深度约1.85 m;第2次开挖至一6.35 m,开挖深度2.00 m;
第3次开挖至一8.35 m,开挖深度2.00 m;第4次开挖至基底 上0.30m (-10.35m),开挖深度2.00m。3) 西区块第3、4施工段:土方开挖分3次自上而下进
行。第1次开挖至钢筋混凝土支撑梁垫层底(一5.40m),
开挖深度0.70〜1.95 m;第2次开挖至一7.40 m,开挖深度
2.00 m:第3次开挖至一9.40 m,开挖深度2.00 m;第4次开
挖至基底上30cm ( — 11.40m),开挖深度2.00m„4) 东区块第5、8施工段:土方开挖分4次自上
而下进行。第1次开挖至钢筋混凝土压顶冠梁垫层底(-5.40 m),开挖深度0.70〜1.95 m;第2次开挖至
—7.40 m,开挖深度2.00 m;第3次开挖至一9.40 m,开挖
深度2.00 m;第4次挖至基底上0.30 m (-10.70 m),开挖
深度1.30 m。5) 东区块第6、7施工段:留土范围上部土方开挖分 3次自上而下进行。第1次开挖至钢筋混凝土冠梁垫层底(-1.50 m),开挖深度约0.70 m;第2次开挖至
-3.50 m,开挖深度2.00 m;第3次开挖至一5.50 m,开挖
深度2.00 m;留土范围土方开挖至一5.50 m标高时停止施
工,非留土范围第4次开挖至一7.50 m,开挖深度2.00 m;
第5次开挖至基底上0.30 m (—10.40 m),开挖深度2.00 m (图 1)。6)留土区域土方开挖至一5.50 m标高时停止施工,
先行在留土斜面上喷射厚90 mm的C20喷射混凝土,配置
¢6.5 mm的钢筋网,纵横间距300 mm。待留土范围以外基
础底板混凝土浇筑完毕,斜围標及斜向钢筋混凝土支撑施
工完成且混凝土强度达到100%后,方可进行留土范围内土
方开挖。留土范围内土方开挖时,原运土坡道均已挖除,
大型挖机及运土车辆己无法施工,只能采用PC60或PC80小
建筑施工•第41卷•第6期1005曹跃军、陈万里、赵 明:多种支护形式的深基坑工程施工技术型挖机将土方装载到小型运输车上,再将土方短驳至出土
口位置,然后采用长臂挖机挖至土方运输车上外运。度的80%后分层开挖土方。5.5水平支撑及围护桩拆除水平内支撑的拆除与地下室的施工交叉进行,在支撑
5.2基坑降排水基坑内设置24 口疏干井排水,坑内集水井采用角钢或 钢筋做成骨架,外包密目铁丝网和2层麻袋,井周用级配碎 石回填,井底比基底深1.5m左右。拆除时必须严格按支撑设计时已考虑到的各种工况逐步进 行,同样必须坚持“先撑后拆”的原则。1) 施工顺序:地下室底板混凝土浇筑并养护一拆除支
撑一施工地下1层墙板和顶板楼板。在基坑外侧四周设置400 mm X 400 mm地面排水沟,
集水井大小为1 mXlmXl m,间距30 m,以及时排出场地
2) 施工方法:根据本工程支撑梁的特点,采用人工
使用空压机分块破碎混凝土支撑梁,分段拆除后及时将混
凝土块运出施工现场,而后在堆场将混凝土块集中破碎。
东西两侧的山水,并将地面水引进邻近下水道或天目山路
北侧的沿山河。基坑外排水:地表处的雨水、施工用水,采用地面排
为满足塔吊协助作业的要求,每段混凝土块质量不得超过
水沟截流,引至城市下水管道的方法解决。具体做法:在
0.2 to基坑周边地面处设置贯通的400 mmX400 mm的砖砌排水 沟,并沿排水沟每30 m处设置1 口 1 000 mm XI 000 mmX
3) 拆除条件:地下室底板混凝土强度达到100%:支
撑梁防护脚手架已搭设并通过验收;基坑周边的材料、管 线及围护已整理好。1 000mm集水井,将地面雨水、污水集中后,排入城市下
水管网。5.6斜撑支模施工在设计图纸中载明的留土区域,土方开挖至一5.50 m
标高时停止施工,斜围標及斜向钢筋混凝土支撑采用在留
基坑内排水:基坑内根据现场情况设纵横向排水沟,
并每隔20 m左右设坑底集中排水井,做好基坑内有组织排 水。排水沟与基坑下坎线的距离应不小于1 m。土斜面上开槽施工,支模施工与压顶梁相同。5.3 土钉墙施工施工流程:按设计要求自上而下分层开挖工作面〜人 工修整坡面(坡面平整度允许误差为20mm)-埋设喷射
混凝土厚度的标志一喷射第1层混凝土(30〜50 mm)—成
5.7基坑监测在基坑周边埋设24根测斜管,测斜管深15 m,水位观
测孔5个,基坑周边地表水平位移及沉降观测点17个。在
坑边和坑内共布置5个地下水位观测孔(水位管),孔深
孔、安设土钉一注浆、安设联结件一绑扎钢筋网、喷射第
15 m,用于观测基坑开挖施工期间地下水位的变化情况。
水位随挖随降,地下水位应保持在开挖面以下lm。2层混凝土(40〜60 mm)-设置坡顶、坡面、坡脚的排水
系统。有土钉剖面的挖土分层,应符合各道土钉的竖向间
6 结语本工程基坑最大开挖深度为12.9 m,属于深基坑工
距,不得超挖,并应留有足够的养护时间。土钉锚杆围护
部位按设计要求挖土至第1道锚杆下0.30 m,紧跟其后进行
程,釆用多种基坑支护形式,包括钻孔灌注桩、放坡、1 道水平钢筋混凝土支撑、复合土钉墙、斜向钢筋混凝土支 撑、三轴水泥搅拌桩等。为确保深基坑工程的安全,在施工过程中釆取疏干井
放坡部位第1道锚杆及喷锚网施工,同时进行基坑外砖砌
排水沟施工,再分层分段往下开挖,分别挖土至第2〜8道 锚杆下0.30 m时,进行各道锚杆及喷锚网施工,分层厚度
为1.20-1.50 mo分段开挖长度不超过30 m,并采用跳段
开挖,待开挖至距坑底0.30m时,留土与承台、地梁等采
降水、分层次土方开挖、土钉墙、水平支撑、斜撑、支撑
及围护桩拆除、基坑监测等多项技术措施,最终按期完成
用人工开挖至底,完成坑底开挖后48 h内完成垫层浇筑工
施工,希望能为此类工程提供经验。作。土钉采用机械成孔,土钉注浆完成后及时进行坡面喷 锚网施工,己施工完毕的土钉及喷锚必须养护48 h后,方
—----_ —— --------参考文献 _ 一 一 ----------- -[1]
魏仁杰.多种基坑支护形式在深基坑中的组合应用[J].岩土工程技 术,2017,31(6):306-310.可进入下道工序施工。5.4压顶梁、水平支撑施工压顶冠梁和钢筋混凝土支撑的施工从两端相向进行。 压顶冠梁和钢筋混凝土支撑应开槽施工。具体流程为:挖 机开挖至压顶冠梁和钢筋混凝土支撑垫层底〜开槽制作安
[3]
[2] 金振,潘国华,安彩霞,等.多种支护形式在超大型深基坑工程中的
应用[J].建筑技术,2011,42(12):1081-1083.蒋洪胜,曹怀武,张建国.多种支护结构形式在深基坑工程中的应用[J].施工技术,2003,32(8): 12-13.装压顶冠梁和钢筋混凝土支撑钢筋f模板制作安装〜浇筑
压顶冠梁和钢筋混凝土支撑混凝土〜压顶冠梁和钢筋混凝 土支撑养护一压顶冠梁和钢筋混凝土支撑强度达到设计强
[4] 李荣玉,阮永芬,施炳军,等.复杂环境的深基坑工程中多种支护型
式飾应用研究[J].河南科学,2014(4):568-572.r\\10062019 • 6 • Building Construction